Document Processing Time Details for draft-narten-ipv6-3177bis-48boundary

“End-to-End Delay from draft-smith to an RFC”

Document Timeline

timeline

IESG Processing

The following table shows the events relating to the document during its IESG processing. The greyed out information is based on the substates and Discuss positions in the tracker. As not all ADs employ substates in the same way, and as all ADs employ them at least somewhat inaccurately, the data in this part of the table is very unreliable.

PERIODVERSTATESUBSTATEDISCUSSESDAYSRESPONSIBLE
(Speculative)
2008-09-12 .. 2010-07-2104Dead-0679Others
2008-09-12 .. 2008-09-1204Dead-00Others
2008-03-11 .. 2008-09-1204AD is watching-0181Others
2007-11-21 .. 2008-03-1103AD is watching-0115Others
2006-12-30 .. 2007-11-2102Dead-0326Others
2006-12-30 .. 2006-12-3002Dead-00Others
2006-07-11 .. 2006-12-3002AD is watching-0169Others

IESG Processing Time Statistics

The document has not been received by the AD/IESG yet, no timing calculated. Note that past attempts to submit the document through the IESG have not been counted, if the document was eventually withdrawn or sent back to the WG.

The (last) responsible AD for this document was Arkko_Jari.

Overall Processing Time Statistics

Document was in individual and WG process for 1834 days, and in IESG/RFC Editor process for 0 days, 1834 days in total. This is 5 years and 0 months.

Data Source

Original source data available in the tracker and draft history.