Document Processing Time Details for draft-ietf-geopriv-policy

“End-to-End Delay from draft-smith to an RFC”

Document Timeline

timeline

IESG Processing

The following table shows the events relating to the document during its IESG processing. The greyed out information is based on the substates and Discuss positions in the tracker. As not all ADs employ substates in the same way, and as all ADs employ them at least somewhat inaccurately, the data in this part of the table is very unreliable.

PERIODVERSTATESUBSTATEDISCUSSESDAYSRESPONSIBLE
(Speculative)
2008-06-26 .. 2008-12-2499AD is watchingAD Followup4178Authors
2008-06-15 .. 2008-06-2699AD is watchingAD Followup411Authors
2008-03-29 .. 2008-06-1599AD is watchingAD Followup576Authors
2008-02-25 .. 2008-03-2999AD is watchingRevised ID Needed534Authors
2007-11-15 .. 2008-02-2599AD is watching-5105Authors
2007-11-08 .. 2007-11-1599AD is watching-67Authors
2007-10-06 .. 2007-11-0899AD is watchingAD Followup632Authors
2007-10-02 .. 2007-10-0699AD is watchingRevised ID Needed64Authors
2007-09-20 .. 2007-10-0299IESG EvaluationRevised ID Needed612Authors
2007-09-19 .. 2007-09-2099IESG Evaluation-61Authors
2007-09-19 .. 2007-09-1999IESG Evaluation-50Authors
2007-09-19 .. 2007-09-1999IESG Evaluation-40Authors
2007-09-19 .. 2007-09-1999IESG Evaluation-30Authors
2007-09-19 .. 2007-09-1999IESG Evaluation-20Authors
2007-09-17 .. 2007-09-1999IESG Evaluation-12Authors
2007-09-04 .. 2007-09-1799IESG Evaluation-013Others
2007-03-07 .. 2007-09-0499Waiting for AD Go-Ahead-0177AD
2007-03-01 .. 2007-03-0799In Last Call-06Others
2007-02-15 .. 2007-03-0199Last Call Requested-016Others
2007-02-03 .. 2007-02-1599AD EvaluationAD Followup012AD
2007-02-02 .. 2007-02-0399AD EvaluationRevised ID Needed01Authors
2007-01-24 .. 2007-02-0299AD Evaluation-08AD
2007-01-08 .. 2007-01-2499AD EvaluationAD Followup016AD
2006-12-11 .. 2007-01-0899AD EvaluationRevised ID Needed032Authors
2006-08-24 .. 2006-12-1199AD Evaluation-0107AD
2006-08-24 .. 2006-08-2499Publication Requested-00AD
2006-04-01 .. 2006-08-2499AD is watching-0143Others
2006-02-13 .. 2006-04-0199AD is watching-048Others
2005-10-26 .. 2006-02-1399Dead-0112Others
2004-10-06 .. 2005-10-2699AD is watching-0385Others

IESG Processing Time Statistics

The document has not been received by the AD/IESG yet, no timing calculated. Note that past attempts to submit the document through the IESG have not been counted, if the document was eventually withdrawn or sent back to the WG.

The (last) responsible AD for this document was Jennings_Cullen.

Overall Processing Time Statistics

Document was in individual and WG process for 1878 days, and in IESG/RFC Editor process for 0 days, 1878 days in total. This is 5 years and 1 months.

Data Source

Original source data available in the tracker.